S | 6 | Director’s Prep Packet
Graded assignment: Director’s Prep Packet (summative). Submit it by the end of the last S day, Fri, Jan 22.
S days: Fri, Jan 15; Wed, Jan 20; Fri, Jan 22. This summative pulls together 6.1–6.4, so most of it is already done: finish it, check every piece matches, and submit.
Today’s Plan
| Time | What you do |
|---|---|
| 10 min | Stinger |
| 5 min | Team Check-In |
| 58 min | Finish the Summative |
| 5 min | Save & Wrap-Up |
Stinger (~10 min)
Answer today’s stinger from the stinger deck on your Stinger Response Sheet: rewrite the question in your own words, answer it in at least 3 sentences, share with a neighbor, copy their answer, then write 1–2 sentences on what your answers had in common.
Reading
Look for: Your category’s rules and runtime cap for the 2026–27 cycle.
Steps
- Draft a shoot-day calendar for the start of DFM 300: which scenes, where, and who’s needed each day.
- Put everything in one folder, in this order: script, shot list, blocking, storyboard, lookbook, cast list, location list, costume/prop list, shoot calendar.
- Check every piece is the latest version and matches the others (same scene numbers, same cast).
- List anything unresolved for Day 1 of DFM 300.
Before You Submit
- Director’s Prep Packet (all 9 pieces)
- Unresolved-items list for DFM 300
- Everything is saved in your team’s DFM folder
- Submitted
Wrap-Up
Save to your team folder and note what’s left before the due date.
🗂 Organize: Put your Stinger Response Sheet in your binder. Save today’s deliverables in the your team's DFM folder folder of your Digital Design project folder on Google Drive.